Day 7. Jan 15, 2016

  • We continued building field elements. The portcullis, moat, ramparts, rock wall, low bar, and platforms are all completed. We are still working on the cheval de frise, rough terrain, sally port, drawbridge, and tower.
  • The rolling chassis for the prototype drive base is fully built, however it is not yet powered.
  • Work has begun on a wooden intake prototype. Hopefully, the intake will be able to intake from the sides and front, as well as defeat several defenses.
Posted in FRC Blog.