Day 22. Jan 30, 2016

  • We fully assembled the sheet metal drive base. (The gearboxes in the photo are temporary)

14

  • We also moved the electronics from the west-coast drive to the sheet metal drive base V1 so it could be used as a programming test bed.

15

  • Today the shooter CAD continued progress.

13

  • We rebuilt the intake in CAD, making it lower profile and lighter-weight.
  • We also decided on ways to mount both the intake and shooter, taking into account how the ball traveled into the drive base (through the intake) and out (through the shooter).
Posted in FRC Blog.