Day 42. Feb 19, 2016

Objectives for the day: Install the electronics on the final robot, set up the pneumatic system on the practice robot, and code code code.

What we did today:

I. We labeled our talons to match the PD board numbers. We also wired everything up , but we still need to work on the wench system and have the motors connected. Otherwise all the electronics are properly Velcro-ed to the final robot.

Finalbot_electronics

II. The pneumatic system on the practice robot is on its way to being assembled…

Practicebot_pneumatics

III. The code for the shooter is running properly and it seems to be very consistent.

Posted in FRC Blog.